Groundworks

< Back to Groundworks

Tintern - Major Excavation

On this site at Tintern we had to excavate about 300 tonnes of soil and level out the site in preparation for an extension. We needed heavy machinery for this one and it took a 13 ton excavator ten days to complete the job, but there was no tipping and haulage needed as the spoil could be levelled on site.

Copyright of Cwrt Henllys Farm © 2007. Design by Bluegg.